6.5 km ·5.2% mitjà· 340m d'ascens · Altitud Màxima 740m · Índex FIETS 1773
Utsunomiya, Japan
Cycle the 大子那須線 (28) (Cat 2). Starting from Utsunomiya, This 6.5km climb averages 5.2% gradient reaching 740m elevation. Surface: paved.
Superfície
Paved100%
Tipus de Via
Secondary60%
Primary20%
Unclassified20%
Carreteres
32128
Tots els noms de via (3)
- 南方須佐木線
- 大子那須線
- 阿寺林道
Ubicació
SpotCode- Inici
- Utsunomiya, Ootawara, Japanke·mu|fi·mu|ru·ke|ki·ha Google Maps Street View
- Final
- Nasushiobara, Ootawara, Japanke·mu|fo·mu|su·fu|su·ki Google Maps Street View
Característiques
Pont
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6438800
360 m at 23.5%
↑ 82mUncat
Pujada #6562249
340 m at 22.6%
↑ 75mUncat
Pujada #5870384
450 m at 21.3%
↑ 94mCat 4
Pujada #3936065
880 m at 19.9%
↑ 171mCat 3
Pujada #4768612
660 m at 19.3%
↑ 124mCat 4
Pujada #6074701
410 m at 18.7%
↑ 76mUncat
Pujada #5949551
430 m at 18.4%
↑ 78mUncat
Pujada #2715829
1.3 km at 17.9%
↑ 232mCat 3
Pujada #5127661
590 m at 17.9%
↑ 103mCat 4
Pujada #6139904
400 m at 17.7%
↑ 70mUncat
Pujada #4894455
640 m at 17.7%
↑ 111mCat 4Asphalt
Pujada #6210331
390 m at 17.5%
↑ 67mUncatAsphalt