6.2 km ·11.9% mitjà· 721m d'ascens · Altitud Màxima 977m · Índex FIETS 8386
Fujieda, Japan
Cycle the 水窪森線 (389) (Cat 1). Starting from Fujieda, This 6.2km climb averages 11.9% gradient reaching 977m elevation. Surface: asphalt.
Cim
- Pic
- 常光寺山 (1438m)
Superfície
Ground50%
Asphalt50%
Tipus de Via
Track36%
Unclassified27%
Residential18%
Path9%
Secondary9%
Carreteres
389
Ubicació
SpotCode- Inici
- Fujieda, Hamamatsu, Japanke·ni|mi·na|ke·tu|lo·lu Google Maps Street View
- Final
- Shizuoka, Hamamatsu, Japanke·ni|mi·lo|de·fi|ku·da Google Maps Street View
Característiques
Pont
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6380408
360 m at 33.3%
↑ 110mCat 4
Pujada #1960768
1.8 km at 32.3%
↑ 531mCat 2
Pujada #5154445
580 m at 28.9%
↑ 160mCat 4
Pujada #6072382
410 m at 25.6%
↑ 100mCat 4Paved
Pujada #2443287
1.5 km at 25.4%
↑ 350mCat 2Ground
Pujada #1975042
1.8 km at 25.3%
↑ 418mCat 2Ground
Pujada #1011807
2.8 km at 24.3%
↑ 642mCat 1Unpaved
Pujada #6164927
400 m at 23.6%
↑ 88mCat 4
Pujada #4943787
630 m at 23.2%
↑ 142mCat 4
Pujada #6173825
400 m at 22.9%
↑ 90mCat 4
Pujada #4687221
680 m at 22.7%
↑ 145mCat 4
Pujada #6439658
350 m at 21.8%
↑ 75mUncat