5.6 km ·5.8% mitjà· 319m d'ascens · Altitud Màxima 361m · Índex FIETS 1818
Shinagawa, Japan
Cycle the 上ノ加江窪川線 (325) (Cat 3). Starting from Shinagawa, This 5.6km climb averages 5.8% gradient reaching 361m elevation.
Tipus de Via
Secondary50%
Residential50%
Carreteres
Principal:上ノ加江窪川線
325
Ubicació
SpotCode- Inici
- Shinagawa, Nakatosa, Japanke·le|pa·ki|lo·la|pa·fa Google Maps Street View
- Final
- Shinagawa, Nakatosa, Japanke·le|pa·ki|ti·tu|ku·ta Google Maps Street View
Característiques
Túnel
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #5606180
490 m at 35.7%
↑ 165mCat 3
ふるさと林道床鍋倉川線 from Shinagawa
1.5 km at 23.1%
↑ 341mCat 2Asphalt
Climb near Shinagawa
1.4 km at 22.6%
↑ 301mCat 3
Pujada #5091592
590 m at 19.0%
↑ 109mCat 4
Pujada #5840865
450 m at 18.9%
↑ 84mUncat
Pujada #3751797
930 m at 18.5%
↑ 167mCat 3
Pujada #6641517
320 m at 18.4%
↑ 56mUncat
大用大方線 (336)
1.6 km at 17.2%
↑ 275mCat 3Unpaved
Pujada #5134478
590 m at 17.1%
↑ 98mCat 4
Pujada #3972743
870 m at 16.7%
↑ 143mCat 4
Pujada #4759395
670 m at 16.7%
↑ 110mCat 4
Pujada #6261782
380 m at 16.7%
↑ 63mUncat