11.6 km ·6.1% mitjà· 703m d'ascens · Altitud Màxima 1165m · Índex FIETS 4255
Fukui-shi, Japan
Cycle the 国道157号 (157) (Cat 1). Starting from Fukui-shi, This 11.6km climb averages 6.1% gradient reaching 1164m elevation. Surface: paved.
Cim
- Pic
- 大舟山 (1431m)
Superfície
Paved100%
Tipus de Via
Unclassified75%
Trunk13%
Residential13%
Carreteres
157
Ubicació
SpotCode- Inici
- Fukui-shi, Katsuyama, Japanke·ni|hi·fi|nu·ke|ha·de Google Maps Street View
- Final
- Fukui-shi, Katsuyama, Japanke·ni|hi·lo|ma·da|ho·fo Google Maps Street View
Característiques
Pont
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6362787
370 m at 30.8%
↑ 109mCat 4
Pujada #4126835
820 m at 25.6%
↑ 202mCat 3
Pujada #6785181
300 m at 24.9%
↑ 71mUncatPaved
Pujada #5390532
540 m at 21.7%
↑ 114mCat 4
Pujada #6726607
310 m at 21.5%
↑ 65mUncatPaved
Pujada #2433955
1.5 km at 20.9%
↑ 302mCat 3
Pujada #4672775
690 m at 20.8%
↑ 139mCat 4
Pujada #2770697
1.3 km at 20.3%
↑ 258mCat 3
Pujada #2432755
1.5 km at 19.4%
↑ 280mCat 3
Pujada #5549403
510 m at 18.6%
↑ 91mCat 4
Pujada #5441202
530 m at 18.4%
↑ 95mCat 4
三方岩岳
5.8 km at 18.3%
↑ 1037mHCPaved