5.4 km ·3.4% mitjà· 182m d'ascens · Altitud Màxima 232m · Índex FIETS 617
Suginami, Japan
Cycle the 錫高野石塚線 (246) (Cat 3). Starting from Suginami, This 5.4km climb averages 3.4% gradient reaching 231m elevation. Surface: paved.
Cim
- Pic
- 高取山 (356m)
Superfície
Paved100%
Tipus de Via
Track33%
Residential33%
Secondary17%
Unclassified17%
Carreteres
246
Ubicació
SpotCode- Inici
- Suginami, Shirosato, Japanke·mu|ha·ne|pu·ha|le·he Google Maps Street View
- Final
- Suginami, Shirosato, Japanke·mu|ha·ni|ho·hu|ta·hi Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #5777502
460 m at 24.3%
↑ 108mCat 4
Pujada #4055824
840 m at 22.0%
↑ 179mCat 3
Pujada #5786984
460 m at 21.0%
↑ 94mCat 4
Pujada #5626696
490 m at 20.5%
↑ 97mCat 4
Pujada #5245811
560 m at 20.4%
↑ 112mCat 4
Pujada #6238496
390 m at 20.1%
↑ 77mUncat
Pujada #3936065
880 m at 19.9%
↑ 171mCat 3
Pujada #4768612
660 m at 19.3%
↑ 124mCat 4
Pujada #4311931
770 m at 19.2%
↑ 145mCat 4
Pujada #4966555
620 m at 19.0%
↑ 114mCat 4
Pujada #4309020
780 m at 18.9%
↑ 144mCat 4
Pujada #2820570
1.3 km at 17.4%
↑ 217mCat 3