5.2 km ·7.0% mitjà· 362m d'ascens · Altitud Màxima 386m · Índex FIETS 2507
Okayama, Japan
Cycle the 金甲山 (Cat 2). Starting from Okayama, This 5.2km climb averages 7.0% gradient reaching 385m elevation. Surface: asphalt.
Cim
- Pic
- 金甲山 (403m)
- POIs Propers
- (400m)
Superfície
Asphalt75%
Paved25%
Tipus de Via
Track33%
Unclassified33%
Secondary17%
Residential17%
Ubicació
SpotCode- Inici
- Okayama, Tamano, Japanke·ni|no·po|tu·ma|ho·te Google Maps Street View
- Final
- Okayama, Tamano, Japanke·ni|no·po|to·mi|sa·pu Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6444474
350 m at 30.6%
↑ 103mCat 4
Pujada #6040428
420 m at 25.4%
↑ 102mCat 4
Pujada #6764097
310 m at 23.8%
↑ 72mUncat
Pujada #6012422
420 m at 19.4%
↑ 79mUncat
Pujada #5112474
590 m at 18.3%
↑ 106mCat 4
Pujada #6658277
320 m at 17.4%
↑ 56mUncat
Pujada #5853272
450 m at 17.4%
↑ 78mUncat
Pujada #6098779
410 m at 17.1%
↑ 68mUncat
Pujada #6282217
380 m at 16.9%
↑ 63mUncat
Pujada #5964954
430 m at 16.9%
↑ 72mUncat
Pujada #6407362
360 m at 16.7%
↑ 60mUncat
Pujada #3823796
910 m at 16.7%
↑ 150mCat 4