11.1 km ·6.7% mitjà· 733m d'ascens · Altitud Màxima 975m · Índex FIETS 4851
Hiroshima, Japan
Cycle the 羅漢山 (Cat 1). Starting from Hiroshima, This 11.1km climb averages 6.7% gradient reaching 975m elevation. Surface: asphalt.
Cim
- Pic
- 羅漢山 (1109m)
- POIs Propers
Superfície
Asphalt100%
Tipus de Via
Unclassified54%
Trunk15%
Primary15%
Secondary8%
Residential8%
Carreteres
Principal:佐伯錦線
11943459
Tots els noms de via (3)
- 佐伯錦線
- 国道434号
- 岩国錦線
Ubicació
SpotCode- Inici
- Hiroshima, Iwakuni, Japanfe·sa|ho·tu|ro·la|mi·su Google Maps Street View
- Final
- Hiroshima, Iwakuni, Japanfe·sa|hu·da|su·so|ne·lu Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6313877
370 m at 23.4%
↑ 83mUncat
Pujada #6595649
330 m at 23.1%
↑ 74mUncat
Pujada #4253819
790 m at 22.8%
↑ 174mCat 3
Pujada #6604734
330 m at 21.6%
↑ 69mUncat
Pujada #5685669
480 m at 21.1%
↑ 97mCat 4
Pujada #6495638
350 m at 20.8%
↑ 70mUncat
Pujada #5673159
480 m at 20.8%
↑ 97mCat 4
Pujada #6330999
370 m at 20.1%
↑ 71mUncat
Pujada #5432462
530 m at 19.8%
↑ 103mCat 4
Pujada #6616443
330 m at 19.6%
↑ 63mUncat
Pujada #5338816
550 m at 19.5%
↑ 104mCat 4
Climb near Hiroshima
3.1 km at 18.5%
↑ 557mCat 2