5.0 km ·7.8% mitjà· 389m d'ascens · Altitud Màxima 454m · Índex FIETS 3026
Gwangju, Republic of Korea
Cycle the 만남재 (Cat 2). Starting from Gwangju, This 5.0km climb averages 7.8% gradient reaching 453m elevation. Surface: concrete.
Cim
- Pic
- 병풍산 (822m)
- Coll
- 만남재
- POIs Propers
Superfície
Asphalt33%
Concrete33%
Dirt17%
Gravel17%
Tipus de Via
Track33%
Residential22%
Path11%
Service11%
Secondary11%
Unclassified11%
Carreteres
Principal:청소년수련관_싱글길
898
Tots els noms de via (3)
- 청소년수련관_싱글길
- 삼인산 임도
- 병풍로
Ubicació
SpotCode- Inici
- Gwangju, Daejeon-myeon, Republic of Koreafe·sa|da·lo|lu·ne|lo·te Google Maps Street View
- Final
- Gwangju, Daejeon-myeon, Republic of Koreafe·sa|da·ma|ta·po|su·ne Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #5257407
560 m at 29.2%
↑ 154mCat 4
Pujada #3277836
1.1 km at 23.9%
↑ 252mCat 3Ground
Pujada #6082719
410 m at 23.1%
↑ 91mCat 4Unpaved
Pujada #6057304
420 m at 23.0%
↑ 94mCat 4
Pujada #3662013
960 m at 22.6%
↑ 211mCat 3
Pujada #6445070
350 m at 22.2%
↑ 75mUncatAsphalt
Pujada #2540252
1.4 km at 21.9%
↑ 302mCat 3Asphalt
Pujada #3545612
1.0 km at 21.5%
↑ 210mCat 3Asphalt
Pujada #5617067
490 m at 21.3%
↑ 101mCat 4Asphalt
Pujada #5479350
520 m at 21.0%
↑ 106mCat 4
Pujada #6260501
380 m at 20.6%
↑ 76mUncatAsphalt
Pujada #6610030
330 m at 20.4%
↑ 66mUncatConcrete