4.8 km ·6.2% mitjà· 299m d'ascens · Altitud Màxima 350m · Índex FIETS 1841
Cheonan, Republic of Korea
Cycle the 도고산로 (645) (Cat 3). Starting from Cheonan, This 4.8km climb averages 6.2% gradient reaching 349m elevation. Surface: earth.
Cim
- Pic
- 도고산 (484m)
- POIs Propers
Superfície
Earth80%
Concrete20%
Tipus de Via
Track33%
Path22%
Unclassified22%
Secondary11%
Residential11%
Carreteres
645
Ubicació
SpotCode- Inici
- Cheonan, Dogo-myeon, Republic of Koreafe·se|ru·fu|da·he|fi·ri Google Maps Street View
- Final
- Cheonan, Yesan-eup, Republic of Koreafe·se|ru·fo|ta·di|ki·le Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #5553469
500 m at 27.1%
↑ 129mCat 4
Pujada #5931799
440 m at 26.8%
↑ 113mCat 4
Pujada #4394611
750 m at 21.4%
↑ 156mCat 4
Pujada #5835984
450 m at 19.6%
↑ 86mUncatConcrete
Pujada #6247655
390 m at 19.6%
↑ 75mUncat
Pujada #4509329
730 m at 19.4%
↑ 138mCat 4
Pujada #2529076
1.4 km at 19.3%
↑ 268mCat 3Earth
Pujada #5827220
460 m at 19.3%
↑ 88mUncatConcrete
Pujada #6694424
320 m at 18.7%
↑ 59mUncat
Pujada #1577670
2.1 km at 18.2%
↑ 373mCat 2Earth
오서길351번길05번길 from Hongseong
2.7 km at 18.0%
↑ 480mCat 2Earth
Pujada #4226477
800 m at 17.8%
↑ 140mCat 4