9.7 km ·5.2% mitjà· 500m d'ascens · Altitud Màxima 627m · Índex FIETS 2583
Okayama, Japan
Cycle the 弥高山 (Cat 2). Starting from Okayama, This 9.7km climb averages 5.2% gradient reaching 627m elevation. Surface: asphalt.
Cim
- Pic
- 弥高山 (654m)
Superfície
Asphalt100%
Tipus de Via
Residential50%
Unclassified42%
Secondary8%
Ubicació
SpotCode- Inici
- Okayama, Takahashi, Japanke·ni|no·sa|mo·li|pe·fi Google Maps Street View
- Final
- Fukuyama, Takahashi, Japanke·ni|no·ta|so·ro|ta·ni Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6593716
330 m at 29.0%
↑ 92mCat 4
Pujada #6350468
370 m at 26.6%
↑ 95mCat 4
Pujada #5985853
430 m at 21.8%
↑ 90mCat 4
Pujada #1814509
1.9 km at 21.4%
↑ 388mCat 2
Pujada #6772254
300 m at 21.4%
↑ 62mUncat
Pujada #6721992
310 m at 20.7%
↑ 63mUncat
Pujada #5078614
600 m at 20.7%
↑ 121mCat 4
Pujada #6359157
370 m at 20.6%
↑ 74mUncat
Pujada #3106863
1.2 km at 20.4%
↑ 230mCat 3
Pujada #5785207
460 m at 20.0%
↑ 91mCat 4
Pujada #6794917
300 m at 20.0%
↑ 59mUncat
Pujada #1761691
1.9 km at 19.8%
↑ 367mCat 2