9.1 km ·5.9% mitjà· 541m d'ascens · Altitud Màxima 1036m · Índex FIETS 3204
Drobeta-Turnu Severin, Romania
Cycle the Gornenți-Costești (DC49) (Cat 2). Starting from Drobeta-Turnu Severin, This 9.1km climb averages 5.9% gradient reaching 1036m elevation. Surface: asphalt.
Cim
- Pic
- Ciolanu Mare (1135m)
- POIs Propers
Superfície
Gravel50%
Asphalt50%
Tipus de Via
Track40%
Service20%
Tertiary20%
Residential20%
Carreteres
DC49
Ubicació
SpotCode- Inici
- Drobeta-Turnu Severin, BALTA, Romaniadi·su|mu·ne|ho·sa|di·di Google Maps Street View
- Final
- Drobeta-Turnu Severin, BALTA, Romaniadi·su|mu·na|nu·le|su·ni Google Maps Street View
Carregant mapa...
Carregant perfil...
climb.nearby.title
climb.nearby.viewAllPujada #6258846
380 m at 22.2%
↑ 83mUncatDirt
Pujada #2792329
1.3 km at 21.3%
↑ 270mCat 3Ground
Pujada #5592480
500 m at 21.2%
↑ 104mCat 4
Pujada #6196020
390 m at 20.5%
↑ 77mUncatGravel
Pujada #2655928
1.4 km at 20.4%
↑ 270mCat 3Dirt
Pujada #1547379
2.1 km at 19.2%
↑ 397mCat 2
Pujada #3096579
1.2 km at 18.7%
↑ 214mCat 3
Pujada #3340634
1.1 km at 17.6%
↑ 182mCat 3
Climb near Drobeta-Turnu Severin
4.4 km at 17.3%
↑ 739mCat 1Dirt
Pujada #1775651
1.9 km at 16.9%
↑ 315mCat 3Dirt
Pujada #4053927
840 m at 16.9%
↑ 137mCat 4
Pujada #1646771
2.0 km at 16.1%
↑ 319mCat 3