Nisporeni

Cat 3Asphalt Compare

2.7 km ·9.5% avg· 256m ascent · Max Altitude 341m · FIETS Index 2427

Iaşi, Republic of Moldova

Cycle the Nisporeni (Cat 3). Starting from Iaşi, This 2.7km climb averages 9.5% gradient reaching 341m elevation. Surface: asphalt.

Summit

Peak
Nisporeni (344m)
Nearby POIs

Surface

Asphalt50%
Unpaved33%
Paving Stones17%

Road Types

Residential46%
Track15%
Unclassified15%
Path8%
Service8%
Tertiary8%

Roads

All road names (5)
  • stradela-1 Alexandru cel Bun
  • SCĂRILE SPRE CRUCEA MÎNTUIRII NEAMULUI ROMANESC
  • strada Industrială păcii
  • strada Alexandru cel Bun
  • strada Industrială-Păcii

Location

SpotCode
Start
Iaşi, Nisporeni, Republic of Moldova
di·re|nu·la|fu·la|fe·he Google Maps Street View
End
Chisinau, Nisporeni, Republic of Moldova
di·re|nu·la|hu·mi|mo·ke Google Maps Street View
Loading map...
Loading profile...