14.2 km ·6.1% avg· 857m ascent · Max Altitude 1484m · FIETS Index 5187
Matsumoto, Japan
Cycle the 林道宮ノ入線 from Matsumoto (HC). Starting from Matsumoto, This 14.2km climb averages 6.1% gradient reaching 1483m elevation. Surface: asphalt.
Summit
- Peak
- 宮入山 (1530m)
Surface
Asphalt100%
Road Types
Unclassified38%
Residential19%
Track13%
Tertiary13%
Secondary13%
Primary6%
Roads
Primary:林道宮ノ入線
297
All road names (3)
- 林道宮ノ入線
- 林道高遠線
- 兎川寺鎌田線
Location
SpotCode- Start
- Matsumoto, Matsumoto, Japanke·no|lo·ni|ni·tu|le·ra Google Maps Street View
- End
- Matsumoto, Matsumoto, Japanke·no|lo·ni|ra·tu|le·do Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5505315
510 m at 30.3%
↑ 147mCat 4
Climb #5529495
510 m at 27.1%
↑ 133mCat 4
Climb #6670538
320 m at 25.4%
↑ 78mUncat
Climb #5513945
510 m at 25.0%
↑ 124mCat 4
Climb #5851106
450 m at 24.2%
↑ 105mCat 4
Climb #6580421
330 m at 22.9%
↑ 74mUncat
Climb #3103580
1.2 km at 20.8%
↑ 235mCat 3
Climb #5946273
440 m at 20.7%
↑ 90mCat 4
Climb #6425983
360 m at 20.3%
↑ 72mUncat
Climb #3787946
920 m at 20.2%
↑ 181mCat 3
Climb #3480114
1.0 km at 19.8%
↑ 196mCat 3Paved
Climb #5083915
600 m at 19.6%
↑ 115mCat 4