2.6 km ·3.9% avg· 101m ascent · Max Altitude 133m · FIETS Index 389
Cheonan, Republic of Korea
Cycle the 응봉서로 from Cheonan (Cat 4). Starting from Cheonan, This 2.6km climb averages 3.9% gradient reaching 133m elevation. Surface: concrete.
Summit
- Pass
- 예산추모공원고개
- Nearby POIs
Surface
Concrete100%
Road Types
Unclassified50%
Track25%
Secondary25%
Roads
Primary:응봉서로
17
All road names (2)
- 응봉서로
- 익산평택고속도로
Location
SpotCode- Start
- Cheonan, Eungbong-myeon, Republic of Koreafe·se|ru·ke|so·mi|pu·mu Google Maps Street View
- End
- Cheonan, Eungbong-myeon, Republic of Koreafe·se|ru·ki|ho·mu|me·da Google Maps Street View
Features
Bridge
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #6469144
350 m at 28.4%
↑ 96mCat 4
Climb #5553469
500 m at 27.1%
↑ 129mCat 4
Climb #1261901
2.4 km at 27.0%
↑ 628mCat 1Earth
Climb #1712524
2.0 km at 25.1%
↑ 472mCat 2Cobblestone
Climb #6106275
410 m at 23.9%
↑ 94mCat 4
Climb #6753717
310 m at 22.4%
↑ 69mUncat
Climb #2880835
1.3 km at 21.6%
↑ 264mCat 3Dirt
Climb #6553213
340 m at 20.1%
↑ 66mUncat
Climb #5673321
480 m at 20.0%
↑ 93mCat 4
Climb #5685207
480 m at 19.9%
↑ 94mCat 4
Climb #3191076
1.1 km at 19.9%
↑ 219mCat 3Concrete
Climb #6247655
390 m at 19.6%
↑ 75mUncat