7.3 km ·6.2% avg· 445m ascent · Max Altitude 951m · FIETS Index 2721
Tottori-shi, Japan
Cycle the 下和奥津川西線 (445) (Cat 2). Starting from Tottori-shi, This 7.3km climb averages 6.2% gradient reaching 951m elevation. Surface: asphalt.
Summit
- Peak
- 山乗山 (1053m)
Surface
Asphalt100%
Road Types
Secondary100%
Roads
Primary:下和奥津川西線
44565
All road names (2)
- 下和奥津川西線
- 久世中和線
Location
SpotCode- Start
- Tottori-shi, Maniwa, Japanke·ni|ne·ha|si·pu|hi·re Google Maps Street View
- End
- Tsuyama, Maniwa, Japanke·ni|ne·hi|te·nu|re·fo Google Maps Street View
Features
Bridge
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #6423813
360 m at 28.0%
↑ 96mCat 4Asphalt
Climb #3742699
940 m at 22.3%
↑ 204mCat 3
Climb #4096671
830 m at 20.0%
↑ 162mCat 4
Climb #3130362
1.1 km at 19.5%
↑ 219mCat 3
Climb #6547073
340 m at 19.3%
↑ 65mUncat
Climb #5313989
550 m at 18.4%
↑ 98mCat 4
Climb #5856490
450 m at 17.8%
↑ 79mUncat
Climb #1501888
2.2 km at 17.8%
↑ 377mCat 2
Climb #1754885
1.9 km at 17.8%
↑ 333mCat 2
Climb #6492809
350 m at 17.5%
↑ 61mUncat
Climb #6048140
420 m at 17.4%
↑ 72mUncat
Climb #6377584
360 m at 17.4%
↑ 61mUncat