7.3 km ·6.4% avg· 457m ascent · Max Altitude 640m · FIETS Index 2874
Kobe, Japan
Cycle the 林道笠形線 from Kobe (Cat 2). Starting from Kobe, This 7.2km climb averages 6.4% gradient reaching 640m elevation. Surface: asphalt.
Summit
- Peak
- 笠形山 (934m)
Surface
Asphalt100%
Road Types
Unclassified67%
Primary33%
Roads
Primary:林道笠形線
34
All road names (2)
- 林道笠形線
- 西脇八千代市川線
Location
SpotCode- Start
- Kobe, Ichikawa, Japanke·no|de·ti|do·re|sa·de Google Maps Street View
- End
- Himeji, Taka, Japanke·no|de·ti|ho·te|hu·lo Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #2960106
1.2 km at 31.1%
↑ 361mCat 2
Climb #6606248
330 m at 30.6%
↑ 97mCat 4
Climb #4598404
700 m at 27.5%
↑ 185mCat 3
Climb #4683594
680 m at 26.5%
↑ 173mCat 3
Climb #3100830
1.2 km at 24.7%
↑ 273mCat 3Asphalt
Climb #3100818
1.2 km at 24.7%
↑ 272mCat 3
大屋波賀線 (48)
1.4 km at 24.3%
↑ 333mCat 2Asphalt
Climb #5503181
510 m at 23.7%
↑ 117mCat 4
Climb #6567741
340 m at 23.6%
↑ 79mUncat
Climb #5844677
450 m at 23.4%
↑ 101mCat 4
Climb #5448075
520 m at 23.3%
↑ 117mCat 4
Climb #4196797
810 m at 23.1%
↑ 181mCat 3