성불로 from Suncheon

Cat 3Concrete Compare

2.4 km ·13.0% avg· 307m ascent · Max Altitude 519m · FIETS Index 3911

Suncheon, Republic of Korea

Cycle the 성불로 from Suncheon (Cat 3). Starting from Suncheon, This 2.4km climb averages 13.0% gradient reaching 519m elevation. Surface: concrete.

Summit

Peak
등주리봉 (896m)
Pass
새재

Surface

Asphalt50%
Concrete50%

Road Types

Track67%
Tertiary33%

Roads

All road names (3)
  • 성불로
  • 성불교
  • 달뜨는길

Location

SpotCode
Start
Suncheon, Bonggang-myeon, Republic of Korea
fe·ru|na·ha|li·fe|ta·so Google Maps Street View
End
Suncheon, Bonggang-myeon, Republic of Korea
fe·ru|mu·fe|su·te|mo·ru Google Maps Street View

Features

Bridge
Loading map...
Loading profile...

Explore Bonggang-myeon