国道399号 (399)

Cat 3Asphalt Compare

6.5 km ·3.7% avg· 239m ascent · Max Altitude 661m · FIETS Index 872

Kōriyama, Japan

Cycle the 国道399号 (399) (Cat 3). Starting from Kōriyama, This 6.5km climb averages 3.7% gradient reaching 661m elevation. Surface: asphalt.

Surface

Asphalt100%

Road Types

Unclassified67%
Trunk17%
Residential17%

Roads

399
Loading map...
Loading profile...

林道梨木平・豊舘線 from Kōriyama

660 m at 17.3%

↑ 112m
Cat 4

五社山

630 m at 16.9%

↑ 104m
Cat 4

Climb near Kōriyama

450 m at 16.7%

↑ 75m
Uncat

あぶくま高原道路 (E80)

400 m at 16.2%

↑ 63m
Uncat

Climb near Iwaki

1.0 km at 16.0%

↑ 158m
Cat 4

羽山支線 from Iwaki

400 m at 15.3%

↑ 61m
Uncat

二本松川俣線 (117)

430 m at 14.6%

↑ 62m
Uncat

Climb near Kōriyama

610 m at 14.6%

↑ 87m
Uncat

Climb near Fukushima

410 m at 14.5%

↑ 58m
Uncat

国道349号 (349)

370 m at 14.3%

↑ 53m
Uncat

Climb near Fukushima

430 m at 14.2%

↑ 59m
Uncat

Climb near Fukushima

430 m at 14.2%

↑ 61m
Uncat