6.3 km ·7.7% avg· 475m ascent · Max Altitude 790m · FIETS Index 3614
Noboribetsu, Japan
Cycle the 洞爺湖登別線 (2) (Cat 2). Starting from Noboribetsu, This 6.2km climb averages 7.7% gradient reaching 789m elevation. Surface: paved.
Summit
- Peak
- オロフレ山 (1230m)
Surface
Paved50%
Asphalt50%
Road Types
Primary83%
Residential8%
Unclassified8%
Roads
Primary:洞爺湖登別線
2
Location
SpotCode- Start
- Noboribetsu, Noboribetsu, Japanke·mo|ki·no|to·ti|fo·fo Google Maps Street View
- End
- Tomakomai, Noboribetsu, Japanke·mo|ko·no|ni·re|fe·ta Google Maps Street View
Features
BridgeTunnel
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5364223
540 m at 17.1%
↑ 91mCat 4
Climb #6785577
300 m at 16.5%
↑ 48mUncat
Climb #6132574
400 m at 16.1%
↑ 64mUncat
Climb #4733300
670 m at 15.6%
↑ 102mCat 4
Climb #6603434
330 m at 15.4%
↑ 50mUncat
Climb #6520500
340 m at 15.4%
↑ 52mUncatAsphalt
Climb #5277863
560 m at 14.9%
↑ 82mUncat
洞爺公園洞爺線 (132)
1.5 km at 14.7%
↑ 219mCat 3Asphalt
Climb #5959501
430 m at 14.6%
↑ 62mUncat
Climb near Muroran
2.3 km at 13.7%
↑ 312mCat 3
Climb #6508423
340 m at 13.5%
↑ 45mUncatAsphalt
測量山
980 m at 13.3%
↑ 129mCat 4