12.5 km ·5.9% avg· 732m ascent · Max Altitude 1004m · FIETS Index 4291
Aomori, Japan
Cycle the 御鼻部山 (Cat 1). Starting from Aomori, This 12.5km climb averages 5.9% gradient reaching 1003m elevation. Surface: paved.
Summit
- Peak
- 御鼻部山 (1010m)
- Nearby POIs
Surface
Paved100%
Road Types
Trunk100%
Roads
Primary:国道102号
102
All road names (2)
- 国道102号
- 奥入瀬バイパス
Location
SpotCode- Start
- Aomori, Towada, Japanke·mi|ka·fu|fu·hi|lu·mo Google Maps Street View
- End
- Aomori, Towada, Japanke·mi|hu·fe|de·tu|sa·lu Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5690572
480 m at 16.6%
↑ 79mUncat
Climb #1373080
2.3 km at 16.1%
↑ 364mCat 2
Climb #3692174
950 m at 14.7%
↑ 137mCat 4
Climb #4917172
630 m at 14.4%
↑ 89mCat 4
Climb #5700402
480 m at 14.3%
↑ 68mUncat
Climb #5726623
470 m at 14.2%
↑ 66mUncat
Climb #5901565
440 m at 13.4%
↑ 59mUncat
Climb #1269301
2.4 km at 12.6%
↑ 301mCat 3
Climb #4033207
850 m at 12.6%
↑ 106mCat 4
Climb #5732022
470 m at 12.5%
↑ 59mUncat
Climb #6260529
380 m at 12.4%
↑ 46mUncat
Climb #4683201
680 m at 12.3%
↑ 83mUncat