1.4 km ·17.9% avg· 235m ascent · Max Altitude 987m · FIETS Index 4073
Utsunomiya, Japan
Cycle the 安戸山 (Cat 3). Starting from Utsunomiya, This 1.4km climb averages 17.9% gradient reaching 987m elevation.
Summit
- Peak
- 安戸山 (1151m)
Road Types
Track100%
Roads
Primary:安戸山支線
Location
SpotCode- Start
- Utsunomiya, Nasushiobara, Japanke·mu|fo·ka|di·da|lu·li Google Maps Street View
- End
- Utsunomiya, Nasushiobara, Japanke·mu|fo·ka|fo·nu|ni·ra Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbs林道渡実線 from Mizunashi
790 m at 24.8%
↑ 190mCat 3
Climb near Utsunomiya
730 m at 20.0%
↑ 143mCat 4
国道121号 目光川治防災 from Utsunomiya
2.1 km at 17.9%
↑ 360mCat 2Paved
藤原宇都宮線 (63)
1.3 km at 17.6%
↑ 214mCat 3
林道西沢線 from Utsunomiya
960 m at 16.9%
↑ 159mCat 4
会津西街道 (121;352)
380 m at 16.4%
↑ 62mUncatPaved
Climb near Nasushiobara
1.0 km at 16.3%
↑ 160mCat 4
Climb near Utsunomiya
500 m at 16.2%
↑ 79mUncat
藤原宇都宮線 (63)
2.7 km at 15.9%
↑ 426mCat 2
鬼怒川トンネル (121;352)
450 m at 15.0%
↑ 66mUncatAsphalt
Climb near Nasushiobara
470 m at 14.3%
↑ 67mUncat
林道小指葛老線 from Utsunomiya
600 m at 14.0%
↑ 79mUncat