5.1 km ·4.2% avg· 214m ascent · Max Altitude 296m · FIETS Index 890
Kushiro, Japan
Cycle the 道東2期林道(町道上庶路本流線) from Kushiro (Cat 3). Starting from Kushiro, This 5.1km climb averages 4.2% gradient reaching 296m elevation. Surface: compacted.
Summit
- Peak
- 鍛高山 (395m)
Surface
Compacted100%
Road Types
Unclassified100%
Roads
Primary:道東2期林道(町道上庶路本流線)
Location
SpotCode- Start
- Kushiro, Shiranuka, Japanke·pe|ma·ne|do·da|fu·ro Google Maps Street View
- End
- Kushiro, Shiranuka, Japanke·pe|ma·ma|ra·si|li·ke Google Maps Street View
Features
Bridge
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #6314709
370 m at 14.8%
↑ 53mUncat
Climb #3549288
1.0 km at 14.6%
↑ 143mCat 4
Climb #5558323
500 m at 14.2%
↑ 69mUncat
Climb #5604517
500 m at 13.8%
↑ 68mUncat
Climb #6669127
320 m at 13.2%
↑ 41mUncat
Climb #3369017
1.1 km at 12.8%
↑ 134mCat 4
Climb #6462835
350 m at 12.3%
↑ 43mUncat
Climb #3849007
900 m at 12.2%
↑ 108mCat 4
Climb near Sarubetsu
1.6 km at 12.2%
↑ 186mCat 3
Climb #6474453
350 m at 12.0%
↑ 42mUncat
Climb near Sarubetsu
1.5 km at 11.7%
↑ 171mCat 3
Climb #4803324
660 m at 11.5%
↑ 75mUncatGravel