5.0 km ·3.6% avg· 184m ascent · Max Altitude 284m · FIETS Index 672
Tokyo, Japan
Cycle the 厚木愛川津久井線 (65) (Cat 3). Starting from Tokyo, This 5.0km climb averages 3.6% gradient reaching 283m elevation. Surface: paved.
Summit
- Peak
- 向山 (375m)
- Pass
- 志田峠
- Nearby POIs
Surface
Paved100%
Road Types
Primary50%
Tertiary33%
Residential17%
Roads
Primary:厚木愛川津久井線
6554
All road names (3)
- 厚木愛川津久井線
- 三増トンネル
- 相模原愛川線
Location
SpotCode- Start
- Tokyo, Aikawa, Japanke·sa|se·ki|li·la|ku·pi Google Maps Street View
- End
- Tokyo, Sagamihara, Japanke·sa|se·ki|mi·na|ha·na Google Maps Street View
Features
Tunnel
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5963039
430 m at 29.4%
↑ 119mCat 4
Climb #6493221
350 m at 28.3%
↑ 95mCat 4
Climb #5721974
470 m at 27.3%
↑ 122mCat 4Paved
Climb #4132600
820 m at 25.2%
↑ 198mCat 3
Climb #5842985
450 m at 24.2%
↑ 102mCat 4
Climb #4771342
660 m at 22.9%
↑ 142mCat 4
Climb #4859198
640 m at 21.6%
↑ 134mCat 4Paved
Climb #5608463
490 m at 20.8%
↑ 100mCat 4
Climb #6552143
340 m at 20.6%
↑ 69mUncat
Climb #5300547
550 m at 19.5%
↑ 103mCat 4Paved
Climb #5671774
480 m at 19.4%
↑ 91mCat 4
Climb #6051776
420 m at 19.2%
↑ 78mUncat