4.8 km ·10.0% avg· 471m ascent · Max Altitude 724m · FIETS Index 4656
Asahikawa, Japan
Cycle the 野花南第1作業道林道 from Asahikawa (Cat 2). Starting from Asahikawa, This 4.8km climb averages 10.0% gradient reaching 724m elevation. Surface: asphalt.
Summit
- Peak
- 野花南岳 (905m)
Surface
Asphalt100%
Road Types
Track50%
Primary50%
Roads
Primary:野花南第1作業道林道
135
All road names (2)
- 野花南第1作業道林道
- 美唄富良野線
Location
SpotCode- Start
- Asahikawa, Ashibetsu, Japanke·mo|he·nu|ki·nu|hu·ha Google Maps Street View
- End
- Asahikawa, Ashibetsu, Japanke·mo|he·nu|ka·pu|so·ne Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #4373064
760 m at 24.9%
↑ 184mCat 3
Climb #6528592
340 m at 22.8%
↑ 76mUncat
Climb #5138375
580 m at 21.4%
↑ 122mCat 4
Climb near Asahikawa
2.5 km at 20.7%
↑ 511mCat 2
Climb #6359275
370 m at 18.3%
↑ 67mUncat
Climb #5924939
440 m at 17.5%
↑ 75mUncat
Climb #6690697
320 m at 16.3%
↑ 51mUncat
青木沢1号林道 from Asahikawa
3.0 km at 14.7%
↑ 433mCat 2Asphalt
Climb #4904743
630 m at 14.7%
↑ 91mCat 4Compacted
Climb near Shimo-furano
1.3 km at 13.7%
↑ 175mCat 3
滝の下連絡林道 from Asahikawa
1.3 km at 13.6%
↑ 171mCat 3
Climb #5854857
450 m at 13.4%
↑ 59mUncat