10.1 km ·6.4% avg· 636m ascent · Max Altitude 1274m · FIETS Index 4003
Tottori-shi, Japan
Cycle the 林道静川氷ノ山線 from Tottori-shi (Cat 2). Starting from Tottori-shi, This 10.1km climb averages 6.4% gradient reaching 1273m elevation. Surface: asphalt.
Summit
- Peak
- 三ノ丸
Surface
Asphalt100%
Road Types
Trunk40%
Unclassified40%
Construction20%
Roads
29
All road names (2)
- 国道29号
- 林道静川氷ノ山線
Location
SpotCode- Start
- Tottori-shi, Shiso, Japanke·no|da·mu|nu·re|pu·ko Google Maps Street View
- End
- Tottori-shi, Yabu, Japanke·no|da·mi|fu·da|mi·do Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5790574
460 m at 31.6%
↑ 136mCat 4
Climb #5156148
580 m at 29.8%
↑ 164mCat 3
Climb #5956433
430 m at 27.6%
↑ 111mCat 4
Climb #4598404
700 m at 27.5%
↑ 185mCat 3
Climb #3565516
990 m at 27.2%
↑ 258mCat 3
Climb #5943253
440 m at 27.2%
↑ 115mCat 4
Climb #4784960
660 m at 26.6%
↑ 167mCat 3
Climb #4683594
680 m at 26.5%
↑ 173mCat 3
Climb #6604097
330 m at 25.4%
↑ 82mUncat
Climb #5636795
490 m at 25.2%
↑ 120mCat 4
Climb #6446557
350 m at 24.8%
↑ 84mUncat
Climb #3100830
1.2 km at 24.7%
↑ 273mCat 3Asphalt