4.4 km ·8.2% avg· 358m ascent · Max Altitude 451m · FIETS Index 2913
Date, Japan
Cycle the Climb near Date (Cat 2). Starting from Date, This 4.4km climb averages 8.2% gradient reaching 451m elevation.
Road Types
Tertiary50%
Residential50%
Location
SpotCode- Start
- Date, Kuromatsunai, Japanke·pu|na·po|mo·na|de·pa Google Maps Street View
- End
- Date, Kuromatsunai, Japanke·pu|na·pa|ha·so|ru·ka Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5120147
590 m at 21.7%
↑ 125mCat 4
Climb #5804685
460 m at 21.0%
↑ 93mCat 4Unpaved
4244林班林道 from Yakumo
2.0 km at 19.1%
↑ 374mCat 2
Climb #6718270
310 m at 16.4%
↑ 50mUncat
Climb #5261553
560 m at 15.1%
↑ 84mUncat
Climb #2850934
1.3 km at 13.1%
↑ 165mCat 4
Climb #2850722
1.3 km at 12.6%
↑ 158mCat 4
相生線 from Date
1.7 km at 12.5%
↑ 211mCat 3Unpaved
国道229号 (229;276)
2.8 km at 12.3%
↑ 336mCat 2
Climb near Kutchan
1.4 km at 12.1%
↑ 165mCat 4
Climb #5057689
600 m at 11.6%
↑ 69mUncat
国道229号 (229;276)
2.8 km at 11.5%
↑ 318mCat 3