4.3 km ·5.8% avg· 245m ascent · Max Altitude 395m · FIETS Index 1402
Kyoto, Japan
Cycle the 牧甲西線 (53) (Cat 3). Starting from Kyoto, This 4.3km climb averages 5.8% gradient reaching 395m elevation. Surface: paved.
Summit
- Pass
- アセボ峠
Surface
Paved100%
Road Types
Primary43%
Unclassified29%
Service14%
Residential14%
Roads
Primary:牧甲西線
53
Location
SpotCode- Start
- Kyoto, Konan, Japanke·ni|du·fo|ki·pa|pi·no Google Maps Street View
- End
- Kyoto, Konan, Japanke·ni|du·fu|hi·ra|ka·de Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbs八ツ尾山
1.4 km at 24.7%
↑ 322mCat 2
Climb #6791231
300 m at 22.4%
↑ 65mUncat
Climb #5983113
430 m at 20.5%
↑ 87mUncat
Climb #5952336
430 m at 20.5%
↑ 87mUncat
Climb #4995964
610 m at 20.0%
↑ 119mCat 4
Climb #2842302
1.3 km at 19.9%
↑ 248mCat 3
Climb near Hikone
1.4 km at 19.5%
↑ 261mCat 3
Climb #5144125
580 m at 18.5%
↑ 105mCat 4Paved
Climb #6743932
310 m at 18.3%
↑ 56mUncat
Climb #3662654
960 m at 17.3%
↑ 163mCat 4Paved
Climb #6660859
320 m at 17.1%
↑ 55mUncat
Climb #5005299
610 m at 16.9%
↑ 101mCat 4