9.7 km ·4.3% avg· 413m ascent · Max Altitude 849m · FIETS Index 1758
Matsue, Japan
Cycle the 広域基幹林道船通山線 from Matsue (Cat 2). Starting from Matsue, This 9.7km climb averages 4.3% gradient reaching 848m elevation. Surface: asphalt.
Summit
- Peak
- 船通山 (1142m)
Surface
Asphalt100%
Road Types
Primary30%
Unclassified30%
Residential20%
Track10%
Tertiary10%
Roads
Primary:広域基幹林道船通山線
15
All road names (2)
- 広域基幹林道船通山線
- 横田多里線
Location
SpotCode- Start
- Matsue, Nichinan, Japanke·ni|ne·pi|du·ti|pi·mu Google Maps Street View
- End
- Matsue, Nichinan, Japanke·ni|ne·so|ha·la|ha·mu Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #4928287
630 m at 24.3%
↑ 147mCat 4
Climb #6667983
320 m at 22.9%
↑ 71mUncat
足立東城線 (12)
1.2 km at 20.4%
↑ 230mCat 3
足立東城線 (12)
1.7 km at 20.0%
↑ 330mCat 2Asphalt
Climb #6377668
360 m at 19.8%
↑ 69mUncat
Climb #3536407
1.0 km at 18.9%
↑ 184mCat 3
Climb #5724750
470 m at 18.5%
↑ 86mUncat
Climb #5559873
500 m at 18.1%
↑ 89mCat 4
Climb #5713292
480 m at 17.4%
↑ 82mUncat
Climb #6254974
380 m at 17.0%
↑ 64mUncatAsphalt
Climb #5452879
520 m at 16.9%
↑ 87mUncat
Climb #5196558
570 m at 16.9%
↑ 93mCat 4