9.0 km ·7.7% avg· 686m ascent · Max Altitude 809m · FIETS Index 5223
Tsu, Japan
Cycle the 青山高原公園線 (512) (Cat 1). Starting from Tsu, This 9.0km climb averages 7.7% gradient reaching 809m elevation. Surface: paved.
Summit
- Peak
- 笠取山 (842m)
Surface
Paved100%
Road Types
Tertiary38%
Residential25%
Track13%
Secondary13%
Unclassified13%
Roads
Primary:青山高原公園線
512
Location
SpotCode- Start
- Tsu, Tsu, Japanke·ni|fe·na|ri·ru|re·he Google Maps Street View
- End
- Tsu, Tsu, Japanke·ni|fe·ne|lu·ti|so·sa Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb near Tsu
430 m at 20.4%
↑ 85mUncat
Climb near Nara-shi
930 m at 19.5%
↑ 178mCat 3
国道368号 (368;369;422)
2.4 km at 19.4%
↑ 455mCat 2
Climb near Matsusaka
460 m at 19.0%
↑ 87mUncat
八知下多気一志線 (666)
1.1 km at 18.6%
↑ 210mCat 3
桝形山
460 m at 17.9%
↑ 81mUncat
国道368号 (368;369)
445 m at 17.8%
↑ 79mUncatPaved
松阪青山線 (29)
520 m at 17.5%
↑ 89mCat 4
Climb near Nara-shi
880 m at 17.2%
↑ 148mCat 4
Climb near Tsu
370 m at 17.1%
↑ 63mUncat
Climb near Tsu
410 m at 17.0%
↑ 67mUncat
Climb near Nara-shi
700 m at 16.8%
↑ 116mCat 4