8.6 km ·4.1% avg· 353m ascent · Max Altitude 442m · FIETS Index 1445
Chitose, Japan
Cycle the 富内林道 from Chitose (Cat 2). Starting from Chitose, This 8.6km climb averages 4.1% gradient reaching 442m elevation. Surface: unpaved.
Surface
Unpaved100%
Road Types
Track86%
Unclassified14%
Roads
Primary:富内林道
All road names (3)
- 富内林道
- 川東林道
- 安住線
Location
SpotCode- Start
- Chitose, Mukawa, Japanke·mo|hu·he|ku·ni|pa·li Google Maps Street View
- End
- Monbetsu-honchō, Mukawa, Japanke·mo|hu·me|te·tu|no·ke Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #6496398
350 m at 20.5%
↑ 69mUncat
Climb #6394201
360 m at 20.4%
↑ 72mUncat
Climb #6747371
310 m at 16.6%
↑ 51mUncat
Climb #6706415
310 m at 16.1%
↑ 49mUncat
Climb #6763021
310 m at 15.8%
↑ 48mUncat
Climb #3600084
980 m at 15.3%
↑ 148mCat 4
Climb #6553925
340 m at 15.2%
↑ 51mUncat
Climb #4767745
660 m at 14.6%
↑ 94mCat 4
Climb #5393917
530 m at 13.9%
↑ 72mUncat
1104林班作業道 from Shimo-furano
1.4 km at 13.9%
↑ 192mCat 3
占冠穂別線 (610)
2.1 km at 13.9%
↑ 293mCat 3
大岩第1環状林道 from Shimo-furano
1.6 km at 13.5%
↑ 215mCat 3Gravel