8.5 km ·8.2% avg· 683m ascent · Max Altitude 1212m · FIETS Index 5508
Shinagawa, Japan
Cycle the 本川大杉線 (17) (Cat 1). Starting from Shinagawa, This 8.5km climb averages 8.2% gradient reaching 1212m elevation.
Road Types
Primary50%
Unclassified50%
Roads
17
Location
SpotCode- Start
- Shinagawa, Ino, Japanke·ni|to·me|mu·re|ru·di Google Maps Street View
- End
- Shinagawa, Okawa, Japanke·ni|to·mi|no·fo|ru·le Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbs新居浜別子山線 (47)
770 m at 37.9%
↑ 268mCat 3
Peak (863m)
320 m at 27.8%
↑ 84mUncat
Climb near Shinagawa
420 m at 23.9%
↑ 97mCat 4
Climb near Niihama
550 m at 23.0%
↑ 123mCat 4
Climb near Shinagawa
610 m at 22.9%
↑ 131mCat 4
Climb near Shinagawa
310 m at 22.1%
↑ 67mUncat
Climb near Kochi
400 m at 21.6%
↑ 85mUncat
伊野仁淀線 (18)
1.3 km at 19.6%
↑ 235mCat 3
Climb near Shinagawa
700 m at 19.4%
↑ 131mCat 4
Climb near Shinagawa
510 m at 19.2%
↑ 95mCat 4
Climb near Shinagawa
630 m at 19.2%
↑ 118mCat 4
Climb near Shinagawa
370 m at 19.1%
↑ 67mUncat