3.4 km ·7.2% avg· 241m ascent · Max Altitude 253m · FIETS Index 1717
Okayama, Japan
Cycle the 国道250号 (250) (Cat 3). Starting from Okayama, This 3.4km climb averages 7.2% gradient reaching 253m elevation. Surface: asphalt.
Summit
- Peak
- 天狗山 (391m)
Surface
Asphalt100%
Road Types
Residential50%
Trunk17%
Secondary17%
Unclassified17%
Roads
397250
All road names (2)
- 寒河本庄岡山線
- 国道250号
Location
SpotCode- Start
- Okayama, Bizen, Japanke·ni|so·lo|hu·se|mu·la Google Maps Street View
- End
- Okayama, Bizen, Japanke·ni|so·lo|hi·se|fo·po Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #3164595
1.1 km at 22.3%
↑ 244mCat 3Unpaved
Climb #6403890
360 m at 21.1%
↑ 73mUncat
Climb #6425180
360 m at 20.5%
↑ 72mUncat
Climb #6151543
400 m at 20.0%
↑ 78mUncat
Climb #6362867
370 m at 20.0%
↑ 72mUncat
Climb #5452667
520 m at 19.0%
↑ 96mCat 4
Climb #5737710
470 m at 18.7%
↑ 87mUncat
Climb #6733996
310 m at 18.7%
↑ 57mUncat
Climb #5688140
480 m at 18.5%
↑ 87mUncat
Climb #6105428
410 m at 17.9%
↑ 73mUncat
Climb #5589787
500 m at 17.6%
↑ 86mUncat
Climb #5964954
430 m at 16.9%
↑ 72mUncat