8.4 km ·3.9% avg· 329m ascent · Max Altitude 644m · FIETS Index 1287
Sakai, Japan
Cycle the 勢井宗川野線 (49) (Cat 2). Starting from Sakai, This 8.4km climb averages 3.9% gradient reaching 644m elevation. Surface: paved.
Surface
Paved100%
Road Types
Path33%
Trunk33%
Primary33%
Roads
Primary:勢井宗川野線
49309
All road names (3)
- 勢井宗川野線
- 笠木道路
- 新川合トンネル
Location
SpotCode- Start
- Sakai, Gojo, Japanke·ni|ha·fe|mo·ne|fu·ra Google Maps Street View
- End
- Sakai, Gojo, Japanke·ni|fu·ra|to·so|ni·li Google Maps Street View
Features
Tunnel
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #5132851
590 m at 33.4%
↑ 183mCat 3
Climb #6700971
310 m at 24.9%
↑ 74mUncat
Climb #6708019
310 m at 23.9%
↑ 68mUncat
Climb #6379280
360 m at 23.1%
↑ 81mUncat
Climb #5545384
510 m at 23.0%
↑ 113mCat 4
Climb #6376417
360 m at 22.9%
↑ 80mUncat
Climb #5693067
480 m at 22.5%
↑ 105mCat 4
Climb #5302467
550 m at 20.9%
↑ 111mCat 4
Climb #3422840
1.0 km at 20.5%
↑ 207mCat 3
Climb #6521435
340 m at 20.4%
↑ 68mUncat
Climb #6129613
400 m at 19.9%
↑ 77mUncat
Climb #6079877
410 m at 19.8%
↑ 79mUncat