Madya-Pahadi (Puspalal) highway (NH03)

HCPaved Compare

8.4 km ·12.7% avg· 1026m ascent · Max Altitude 2118m · FIETS Index 12594

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 8.4km climb averages 12.7% gradient reaching 2118m elevation. Surface: paved.

Summit

Nearby POIs

Surface

Paved50%
Ground50%

Road Types

Unclassified75%
Secondary25%

Roads

NH03

Location

SpotCode
Start
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|si·no|ta·ta Google Maps Street View
End
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|tu·he|ma·me Google Maps Street View
Loading map...
Loading profile...

Explore Bhagawatimai