Bukit Trig

Cat 3Asphalt Compare

3.3 km ·6.3% avg· 207m ascent · Max Altitude 213m · FIETS Index 1291

Sandakan, Malaysia

Cycle the Bukit Trig (Cat 3). Starting from Sandakan, This 3.3km climb averages 6.3% gradient reaching 212m elevation. Surface: asphalt.

Summit

Peak
Bukit Trig (198m)
Nearby POIs

Surface

Asphalt83%
Concrete17%

Road Types

Residential75%
Trunk13%
Unclassified13%

Roads

Primary:Jalan Bukit Trig
22
All road names (4)
  • Jalan Bukit Trig
  • Lorong Yeng Seng 1
  • Jalan Utara
  • Jalan Sentosa
Loading map...
Loading profile...