3.3 km ·8.2% avg· 265m ascent · Max Altitude 308m · FIETS Index 2157
Fukuoka, Japan
Cycle the 九千部山横断線 from Fukuoka (Cat 3). Starting from Fukuoka, This 3.2km climb averages 8.2% gradient reaching 307m elevation. Surface: asphalt.
Summit
- Peak
- 雲野尾峠 (400m)
Surface
Asphalt100%
Road Types
Unclassified57%
Residential29%
Track14%
Roads
Primary:九千部山横断線
Location
SpotCode- Start
- Fukuoka, Tosu, Japanfe·se|fa·te|ma·da|ne·sa Google Maps Street View
- End
- Fukuoka, Tosu, Japanfe·se|fa·te|ro·no|hu·ke Google Maps Street View
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbs西山
960 m at 28.0%
↑ 259mCat 3
玉名八女線 (4)
330 m at 25.2%
↑ 80mUncat
三潴上陽線 (84)
580 m at 22.2%
↑ 125mCat 4
九千部山横断線 from Fukuoka
420 m at 21.8%
↑ 89mCat 4
Peak (265m)
490 m at 21.2%
↑ 102mCat 4
後川内黒木線 (797)
530 m at 21.0%
↑ 109mCat 4
Climb near Fukuoka
610 m at 21.0%
↑ 124mCat 4
Climb near Fukuoka
430 m at 20.9%
↑ 87mUncat
Peak (265m)
540 m at 20.6%
↑ 108mCat 4
九千部山横断線 from Fukuoka
450 m at 19.8%
↑ 87mUncat
Climb near Fukuoka
690 m at 19.7%
↑ 134mCat 4
Climb near Kumamoto
420 m at 19.4%
↑ 80mUncat