Bukit Trig

Cat 3Asphalt Compare

3.2 km ·6.4% avg· 207m ascent · Max Altitude 213m · FIETS Index 1319

Sandakan, Malaysia

Cycle the Bukit Trig (Cat 3). Starting from Sandakan, This 3.2km climb averages 6.4% gradient reaching 212m elevation. Surface: asphalt.

Summit

Peak
Bukit Trig (198m)
Nearby POIs

Surface

Asphalt83%
Concrete17%

Road Types

Residential71%
Trunk14%
Unclassified14%

Roads

Primary:Jalan Bukit Trig
22
All road names (4)
  • Jalan Bukit Trig
  • Jalan Sentosa
  • Jalan Utara
  • Lorong Yeng Seng 1
Loading map...
Loading profile...