3.1 km ·13.7% avg· 408m ascent · Max Altitude 647m · FIETS Index 5429
Minato, Japan
Cycle the 美山金屋バイパス (424) (Cat 2). Starting from Minato, This 3.1km climb averages 13.7% gradient reaching 646m elevation. Surface: paved.
Surface
Paved100%
Road Types
Trunk33%
Residential33%
Unclassified33%
Roads
Primary:美山金屋バイパス
424
All road names (2)
- 美山金屋バイパス
- 国道424号
Location
SpotCode- Start
- Minato, Aridagawa, Japanke·li|ma·ma|he·fo|pi·la Google Maps Street View
- End
- Minato, Aridagawa, Japanke·li|ma·ma|na·fi|na·la Google Maps Street View
Features
Tunnel
Loading map...
Loading profile...
Nearby Climbs
View all nearby climbsClimb #6626535
330 m at 26.6%
↑ 83mUncat
Climb #6074675
410 m at 26.3%
↑ 104mCat 4
Climb #6698865
318 m at 25.0%
↑ 80mUncat
Climb #6037651
420 m at 23.8%
↑ 96mCat 4
Climb #1484275
2.2 km at 23.4%
↑ 487mCat 2
Climb #5330760
550 m at 23.2%
↑ 125mCat 4
Climb #3909165
890 m at 23.0%
↑ 199mCat 3
Climb #2147482
1.6 km at 22.4%
↑ 358mCat 2
Climb #4726463
670 m at 22.4%
↑ 143mCat 4
Climb #5418297
530 m at 21.8%
↑ 112mCat 4
Climb #6653952
320 m at 20.5%
↑ 65mUncat
Climb #1605002
2.1 km at 20.3%
↑ 401mCat 2