Gotthard-Strassentunnel (A2)

Cat 2Asphalt Compare

7.9 km ·7.7% avg· 603m ascent · Max Altitude 2309m · FIETS Index 4616

Schwyz, The Swiss Confederation

Cycle the Gotthard-Strassentunnel (A2) (Cat 2). Starting from Schwyz, This 7.9km climb averages 7.7% gradient reaching 2309m elevation. Surface: asphalt.

Summit

Peak
Schwarzlochhorn (2744m)
Pass
Sunnig Lücke

Surface

Asphalt69%
Sett23%
Paved8%

Road Types

Secondary53%
Track24%
Primary12%
Service12%

Roads

A25612
All road names (2)
  • Gotthard-Strassentunnel
  • Nuova strada del Passo del San Gottardo

Location

SpotCode
Start
Schwyz, Hospental, The Swiss Confederation
do·du|ta·hi|da·ha|do·mu Google Maps Street View
End
Locarno, Airolo, The Swiss Confederation
do·du|so·fu|lu·ke|si·de Google Maps Street View

Features

Tunnel
Loading map...
Loading profile...