420 m ·5.0% průměr· 21m převýšení · Max. výška 50m · Index FIETS 103
Bandar Seri Begawan, Brunei
Cycle the Jalan Chempaka from Bandar Seri Begawan (Cat 5). Starting from Bandar Seri Begawan, This 0.4km climb averages 5.0% gradient reaching 50m elevation. Surface: concrete.
Vrchol
- Blízké POI
Povrch
Concrete100%
Typy silnic
Residential100%
Silnice
Hlavní:Jalan Chempaka
Všechny názvy silnic (4)
- Simpang 122
- Simpang 119
- Jalan Kiarong
- Jalan Chempaka
Poloha
SpotCode- Start
- Bandar Seri Begawan, Gadong, Bruneimu·so|do·he|ri·fi|de·pa Google Maps Street View
- Cíl
- Bandar Seri Begawan, Gadong, Bruneimu·so|do·he|ri·fa|me·ho Google Maps Street View
Načítání mapy...
Načítání profilu...
climb.nearby.title
climb.nearby.viewAllTo Jalan Kubong-Medamit from Limbang
340 m at 17.9%
↑ 59mUncatAsphalt
Climb near Limbang
350 m at 17.7%
↑ 61mUncat
Jalan Bukit Mas Tower from Limbang
1.1 km at 16.5%
↑ 182mCat 3
Jalan Labu (AH150)
410 m at 14.1%
↑ 58mUncatAsphalt
Jalan Kubong-Mendamit (1-85)
820 m at 13.2%
↑ 107mCat 4Unpaved
Simpang 173 from Mentiri
430 m at 12.5%
↑ 53mUncatAsphalt
Jalan Penghubung Tanah Jambu from Mentiri
460 m at 12.4%
↑ 57mUncatAsphalt
Climb near Limbang
990 m at 12.2%
↑ 119mCat 4
Jalan Berita from Bandar Seri Begawan
310 m at 12.1%
↑ 37mUncatAsphalt
Jalan Kampong Kianggeh from Bandar Seri Begawan
300 m at 12.1%
↑ 37mUncatConcrete
Simpang 450 from Mentiri
310 m at 11.9%
↑ 37mUncatAsphalt
Jalan Kota Batu from Bandar Seri Begawan
940 m at 11.7%
↑ 108mCat 4Asphalt