8.7 km ·5.8% průměr· 500m převýšení · Max. výška 771m · Index FIETS 2871
Shizuoka, Japan
Cycle the 藤枝黒俣線 (32) (Cat 2). Starting from Shizuoka, This 8.7km climb averages 5.8% gradient reaching 771m elevation. Surface: asphalt.
Vrchol
- Průsmyk
- 清笹峠
Povrch
Asphalt100%
Typy silnic
Primary50%
Track25%
Unclassified25%
Silnice
Hlavní:林道藤ヶ峰線
6332
Všechny názvy silnic (3)
- 藤枝天竜線
- 林道藤ヶ峰線
- 藤枝黒俣線
Poloha
SpotCode- Start
- Shizuoka, Shimada, Japanke·ni|mu·mu|pe·pi|ke·mo Google Maps Street View
- Cíl
- Shizuoka, Fujieda, Japanke·ni|mu·se|nu·mu|po·mu Google Maps Street View
Vlastnosti
Most
Načítání mapy...
Načítání profilu...
climb.nearby.title
climb.nearby.viewAll大向富沢線 (196)
890 m at 26.4%
↑ 226mCat 3
金谷峠
340 m at 26.3%
↑ 87mUncat
京丸林道 from Shizuoka
1.5 km at 25.4%
↑ 350mCat 2Ground
Climb near Shizuoka
470 m at 24.9%
↑ 114mCat 4
京丸林道 from Shizuoka
2.8 km at 24.3%
↑ 642mCat 1Unpaved
掛川川根線 (39)
630 m at 23.2%
↑ 142mCat 4
Climb near Shizuoka
400 m at 22.9%
↑ 90mCat 4
Climb near Shizuoka
680 m at 22.7%
↑ 145mCat 4
Climb near Shizuoka
340 m at 22.3%
↑ 72mUncat
Climb near Shizuoka
1.7 km at 21.7%
↑ 358mCat 2
蕎麦粒山
2.3 km at 21.3%
↑ 465mCat 2Concrete
Climb near Shizuoka
820 m at 21.1%
↑ 168mCat 3