BP Highway (NH13)

Cat 1Paved compare.addToCompare

9.7 km ·7.6% gns.· 729m stigning · Maks. højde 1550m · FIETS-indeks 5460

Kathmandu, NEPAL

Cycle the BP Highway (NH13) (Cat 1). Starting from Kathmandu, This 9.7km climb averages 7.6% gradient reaching 1550m elevation. Surface: paved.

Top

Nærliggende POI'er

Overflade

Paved100%

Vejtyper

Unclassified55%
Secondary18%
Trunk9%
Tertiary9%
Residential9%

Veje

Primær:BP Highway
NH13
Alle vejnavne (2)
  • BP Highway
  • B.P Highway - Phulbari Road
Indlæser kort...
Indlæser profil...