21.5 km ·9.5% Durchschnitt· 2019m Höhenmeter · Max. Höhe 2516m · FIETS-Index 18962
Malang, Indonesia
Cycle the Bukit Cinta (HC). Starting from Malang, This 21.5km climb averages 9.5% gradient reaching 2515m elevation. Surface: paved.
Gipfel
- Berggipfel
- Bukit Cinta
- POIs in der Nähe
Oberfläche
Paved100%
Straßentypen
Tertiary33%
Residential33%
Unclassified25%
Secondary8%
Standort
SpotCode- Start
- Malang, Pasuruan, Indonesiano·ku|ma·ru|ro·pi|ke·ni Google Maps Street View
- Ziel
- Malang, Pasuruan, Indonesiano·ku|ma·ni|ho·ti|da·sa Google Maps Street View
Karte wird geladen...
Profil wird geladen...
climb.nearby.title
climb.nearby.viewAllAnstieg #2370400
1.5 km at 35.1%
↑ 458mCat 2Unpaved
Anstieg #5207971
570 m at 31.9%
↑ 170mCat 3
Anstieg #6186297
400 m at 27.9%
↑ 107mCat 4
Anstieg #2691406
1.3 km at 24.6%
↑ 321mCat 2
Anstieg #2806909
1.3 km at 23.0%
↑ 288mCat 3
Anstieg #4818796
650 m at 22.8%
↑ 144mCat 4
Anstieg #5424774
530 m at 22.4%
↑ 116mCat 4
Climb near Malang
2.7 km at 21.9%
↑ 582mCat 2
Anstieg #2102780
1.7 km at 21.6%
↑ 349mCat 2
Anstieg #2804485
1.3 km at 21.1%
↑ 265mCat 3
Climb near Malang
6.4 km at 20.4%
↑ 1269mHCUnpaved
Anstieg #4423249
750 m at 20.3%
↑ 150mCat 4