1.5 km ·3.1% batez beste· 45m igoera · Gehienezko Altituera 64m · FIETS Indizea 139
Mentiri, Brunei
Cycle the Jalan Penghubung Tanah Jambu from Mentiri (Cat 5). Starting from Mentiri, This 1.5km climb averages 3.1% gradient reaching 63m elevation. Surface: asphalt.
Gailurra
- Inguruko POIak
Azalera
Asphalt100%
Errepide Motak
Construction50%
Primary25%
Primary Link25%
Errepideak
Nagusia:Jalan Penghubung Tanah Jambu
Errepide izen guztiak (2)
- Jalan Penghubung Tanah Jambu
- Jalan Utama Tanah Jambu
Kokapena
SpotCode- Hasiera
- Mentiri, Mentiri, Bruneimu·so|do·ho|pi·li|de·da Google Maps Street View
- Amaiera
- Mentiri, Mentiri, Bruneimu·so|do·he|le·lo|ne·se Google Maps Street View
Mapa kargatzen...
Profila kargatzen...
climb.nearby.title
climb.nearby.viewAllJalan Bukit Mas Tower from Limbang
1.1 km at 16.5%
↑ 182mCat 3
Jalan Labu (AH150)
410 m at 14.1%
↑ 58mUncatAsphalt
Simpang 173 from Mentiri
430 m at 12.5%
↑ 53mUncatAsphalt
Jalan Penghubung Tanah Jambu from Mentiri
460 m at 12.4%
↑ 57mUncatAsphalt
Jalan Berita from Bandar Seri Begawan
310 m at 12.1%
↑ 37mUncatAsphalt
Jalan Kampong Kianggeh from Bandar Seri Begawan
300 m at 12.1%
↑ 37mUncatConcrete
Simpang 450 from Mentiri
310 m at 11.9%
↑ 37mUncatAsphalt
Jalan Kota Batu from Bandar Seri Begawan
940 m at 11.7%
↑ 108mCat 4Asphalt
Simpang 173 from Mentiri
500 m at 11.0%
↑ 55mUncatAsphalt
Simpang 23-16 from Mentiri
500 m at 11.0%
↑ 54mUncatAsphalt
Jalan Tanjung Selasih from Mentiri
500 m at 11.0%
↑ 55mUncatAsphalt
Simpang 179 from Mentiri
500 m at 10.8%
↑ 54mUncatAsphalt