Madya-Pahadi (Puspalal) highway (NH03)

HCGround compare.addToCompare

6.8 km ·평균 13.0%· 854m 상승 · 최고 고도 1891m · FIETS 지수 10798

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 6.8km climb averages 13.0% gradient reaching 1891m elevation. Surface: ground.

정상

근처 POI

노면

Ground75%
Paved25%

도로 유형

Unclassified86%
Secondary14%

도로

60DR018NH03
시작
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|ne·li|sa·ro Google Maps Street View
종료
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·to|de·ku|so·da Google Maps Street View
지도 로딩 중...
프로필 로딩 중...