1.0 km ·평균 4.9%· 51m 상승 · 최고 고도 71m · FIETS 지수 245
Bandar Seri Begawan
Cycle the Simpang 40 from Bandar Seri Begawan (Cat 5). Starting from Bandar Seri Begawan, This 1.0km climb averages 4.9% gradient reaching 71m elevation. Surface: asphalt.
정상
- 근처 POI
노면
Asphalt100%
도로 유형
Secondary83%
Service17%
도로
주요:Simpang 40
모든 도로명 (2)
- Jalan Kampong Kianggeh
- Simpang 40
위치
SpotCode- 시작
- Bandar Seri Begawan, Kota Batumu·so|do·hi|po·pe|hu·le Google Maps Street View
- 종료
- Bandar Seri Begawan, Kota Batumu·so|do·hi|po·lo|ha·fa Google Maps Street View
특징
다리
지도 로딩 중...
프로필 로딩 중...
climb.nearby.title
climb.nearby.viewAllTo Jalan Kubong-Medamit from Limbang
340 m at 17.9%
↑ 59mUncatAsphalt
Climb near Limbang
350 m at 17.7%
↑ 61mUncat
Jalan Bukit Mas Tower from Limbang
1.1 km at 16.5%
↑ 182mCat 3
Jalan Labu (AH150)
410 m at 14.1%
↑ 58mUncatAsphalt
Jalan Kubong-Mendamit (1-85)
820 m at 13.2%
↑ 107mCat 4Unpaved
Simpang 173 from Mentiri
430 m at 12.5%
↑ 53mUncatAsphalt
Jalan Penghubung Tanah Jambu from Mentiri
460 m at 12.4%
↑ 57mUncatAsphalt
Climb near Limbang
990 m at 12.2%
↑ 119mCat 4
Jalan Berita from Bandar Seri Begawan
310 m at 12.1%
↑ 37mUncatAsphalt
Jalan Kampong Kianggeh from Bandar Seri Begawan
300 m at 12.1%
↑ 37mUncatConcrete
Simpang 450 from Mentiri
310 m at 11.9%
↑ 37mUncatAsphalt
Jalan Kota Batu from Bandar Seri Begawan
940 m at 11.7%
↑ 108mCat 4Asphalt