Madya-Pahadi (Puspalal) highway (NH03)

HCPaved compare.addToCompare

8.4 km ·12.7% vid.· 1026m kopimas · Maks. aukštis 2118m · FIETS indeksas 12594

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 8.4km climb averages 12.7% gradient reaching 2118m elevation. Surface: paved.

Viršūnė

Artimi POI

Danga

Paved50%
Ground50%

Kelių tipai

Unclassified75%
Secondary25%

Keliai

NH03
Pradžia
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|si·no|ta·ta Google Maps Street View
Pabaiga
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|tu·he|ma·me Google Maps Street View
Įkeliamas žemėlapis...
Įkeliamas profilis...