7.3 km ·6.4% média· 457m de desnível · Altitude máx 640m · Índice FIETS 2874
Kobe, Japan
Cycle the 林道笠形線 from Kobe (Cat 2). Starting from Kobe, This 7.2km climb averages 6.4% gradient reaching 640m elevation. Surface: asphalt.
Cume
- Pico
- 笠形山 (934m)
Superfície
Asphalt100%
Tipos de estrada
Unclassified67%
Primary33%
Estradas
Principal:林道笠形線
34
Todos os nomes de estradas (2)
- 林道笠形線
- 西脇八千代市川線
Localização
SpotCode- Início
- Kobe, Ichikawa, Japanke·no|de·ti|do·re|sa·de Google Maps Street View
- Fim
- Himeji, Taka, Japanke·no|de·ti|ho·te|hu·lo Google Maps Street View
Carregando mapa...
Carregando perfil...
climb.nearby.title
climb.nearby.viewAllSubida #2960106
1.2 km at 31.1%
↑ 361mCat 2
Subida #6606248
330 m at 30.6%
↑ 97mCat 4
Subida #4598404
700 m at 27.5%
↑ 185mCat 3
Subida #4683594
680 m at 26.5%
↑ 173mCat 3
Subida #3100830
1.2 km at 24.7%
↑ 273mCat 3Asphalt
Subida #3100818
1.2 km at 24.7%
↑ 272mCat 3
大屋波賀線 (48)
1.4 km at 24.3%
↑ 333mCat 2Asphalt
Subida #5503181
510 m at 23.7%
↑ 117mCat 4
Subida #6567741
340 m at 23.6%
↑ 79mUncat
Subida #5844677
450 m at 23.4%
↑ 101mCat 4
Subida #5448075
520 m at 23.3%
↑ 117mCat 4
Subida #4196797
810 m at 23.1%
↑ 181mCat 3