2.3 km ·3.8% média· 85m de desnível · Altitude máx 131m · Índice FIETS 318
Cheonan, Republic of Korea
Cycle the 충절로 from Cheonan (Cat 5). Starting from Cheonan, This 2.3km climb averages 3.8% gradient reaching 130m elevation. Surface: concrete.
Cume
- Passo
- 닭실고개
- POIs próximos
Superfície
Concrete100%
Tipos de estrada
Track17%
Primary17%
Tertiary17%
Residential17%
Primary Link17%
Unclassified17%
Estradas
29
Localização
SpotCode- Início
- Cheonan, Hongdong-myeon, Republic of Koreafe·se|ru·ko|ku·ke|mu·lu Google Maps Street View
- Fim
- Cheonan, Hongdong-myeon, Republic of Koreafe·se|ru·ke|he·re|he·te Google Maps Street View
Características
Ponte
Carregando mapa...
Carregando perfil...
climb.nearby.title
climb.nearby.viewAllClimb near Daejeon
350 m at 28.4%
↑ 96mCat 4
천방산
500 m at 27.1%
↑ 129mCat 4
Climb near Boryeong
2.4 km at 27.0%
↑ 628mCat 1Earth
가야산 가야봉
2.0 km at 25.1%
↑ 472mCat 2Cobblestone
Climb near Daejeon
410 m at 23.9%
↑ 94mCat 4
Climb near Daejeon
310 m at 22.4%
↑ 69mUncat
백월산
1.3 km at 21.6%
↑ 264mCat 3Dirt
꽃뫼봉
420 m at 20.8%
↑ 85mUncat
면암로 from Daejeon
340 m at 20.1%
↑ 66mUncat
다리재길 from Boryeong
480 m at 20.0%
↑ 93mCat 4
Climb near Daejeon
480 m at 19.9%
↑ 94mCat 4
시루봉
1.1 km at 19.9%
↑ 219mCat 3Concrete