6.0 km ·10.0% média· 587m de desnível · Altitude máx 883m · Índice FIETS 5781
Shizunai-furukawachō, Japan
Cycle the 鉱山の沢林道 from Shizunai-furukawachō (Cat 2). Starting from Shizunai-furukawachō, This 6.0km climb averages 10.0% gradient reaching 883m elevation.
Tipos de estrada
Track50%
Residential50%
Estradas
Todos os nomes de estradas (2)
- 幌尻林道
- 鉱山の沢林道
Localização
SpotCode- Início
- Shizunai-furukawachō, Biratori, Japanke·mo|ho·ra|ne·ko|ri·la Google Maps Street View
- Fim
- Shizunai-furukawachō, Biratori, Japanke·mo|ho·ra|ma·do|ro·ko Google Maps Street View
Carregando mapa...
Carregando perfil...
climb.nearby.title
climb.nearby.viewAllSubida #6496398
350 m at 20.5%
↑ 69mUncat
Subida #6394201
360 m at 20.4%
↑ 72mUncat
Subida #6564643
340 m at 19.3%
↑ 63mUncat
国道274号 (274)
1.3 km at 18.4%
↑ 240mCat 3Unpaved
Subida #6510040
340 m at 17.0%
↑ 55mUncat
Subida #6747371
310 m at 16.6%
↑ 51mUncat
Subida #6706415
310 m at 16.1%
↑ 49mUncat
Subida #6263988
380 m at 16.1%
↑ 60mUncat
Subida #5685051
480 m at 16.1%
↑ 74mUncat
1104林班作業道 from Shimo-furano
1.4 km at 13.9%
↑ 192mCat 3
占冠穂別線 (610)
2.1 km at 13.9%
↑ 293mCat 3
大岩第1環状林道 from Shimo-furano
1.6 km at 13.5%
↑ 215mCat 3Gravel